Mantis plugin KPI 1.00

Author:		Cas Nuy
Website:	http://www.nuy.info
Mail:		Cas-at-Nuy.info
Copyright:	GPL

This plugin enables generating KPI's based upon achieving a certain status.

Installation:

Copy the plugin into the plugins directory of your mantis installation.
Log on to mantis with Admin right
Go to Manage
Select Manage Plugins
Install KPI
Configure plugin by clicking on the name after install.
On the main menu a new option will be available.

How does it work?
This plugin calculates the number of days between 2 statusses en evaluates that against a ser number of days.
Default it will calculate between Confirm date and Resolved date.
Only issues with a date on Resolving are selected.
Next the last confirm date is retrieved.
If not found, it will retrieve the last assign date.
If not found, it will use the date of submittal.
Next these 2 dates are compared and if the period is less or equal than the set number of days (default 2), it will qualify the issue resolved within agreed period.
Output is available on screen and as download.

Output:
Issue-id
Assignee
Date of submittal
Period between Status New and Confirmed
Date of status Confirmed
Period between Status Confirmed and Resolved
Date of status Resolved
Period between Status New and Resolved
On time
Category

In addition some additional overview have been added which can also be downloaded to XLS
