Re: No tasks shown after selecting "Show only my tasks" filt
I've posted this problem in https://www.eclipse.org/forums/index.php/t/822460/, which originated a bug report in Mylyn.
- 30 Sep 2014, 16:50
- Forum: Mylyn Connector
- Topic: No tasks shown after selecting "Show only my tasks" filter
- Replies: 1
- Views: 33219
No tasks shown after selecting "Show only my tasks" filter
Hi all,
I'm starting to use Mylyn with mantis (Eclipse 4.4.1; Mylyn 3.13.0; Mantis Connector: 3.10.1).
I'm able to load all tasks from a specific project. Some of these tasks are assigned to me.
Although when i click on "Show only my tasks" filter, all tasks are cleared.
I was expecting too see ...
I'm starting to use Mylyn with mantis (Eclipse 4.4.1; Mylyn 3.13.0; Mantis Connector: 3.10.1).
I'm able to load all tasks from a specific project. Some of these tasks are assigned to me.
Although when i click on "Show only my tasks" filter, all tasks are cleared.
I was expecting too see ...