Hi all,
I'm starting to use Mylyn with mantis (Eclipse 4.4.1; Mylyn 3.13.0; Mantis Connector: 3.10.1).
I'm able to load all tasks from a specific project. Some of these tasks are assigned to me.
Although when i click on "Show only my tasks" filter, all tasks are cleared.
I was expecting too see only the tasks "assigned" to me. The term "assigned" as know in mantis.
Right?
I've already checked this link:
http://wiki.eclipse.org/Mylyn/FAQ#Why_d ... sk_List.3F
but everything is ok. I'm not using any other filter.
I believe that "Show only my tasks" associates "my" with the user I configure to access mantis.
And then filters the issues to show only the issues with assigned field equal to that user....
Any help?
Regards,
Francisco Mourão
No tasks shown after selecting "Show only my tasks" filter
Moderators: Developer, Contributor
Re: No tasks shown after selecting "Show only my tasks" filt
I've posted this problem in https://www.eclipse.org/forums/index.php/t/822460/, which originated a bug report in Mylyn.