No tasks shown after selecting "Show only my tasks" filter
Posted: 30 Sep 2014, 16:50
Hi all,
I'm starting to use Mylyn with mantis (Eclipse 4.4.1; Mylyn 3.13.0; Mantis Connector: 3.10.1).
I'm able to load all tasks from a specific project. Some of these tasks are assigned to me.
Although when i click on "Show only my tasks" filter, all tasks are cleared.
I was expecting too see only the tasks "assigned" to me. The term "assigned" as know in mantis.
Right?
I've already checked this link:
http://wiki.eclipse.org/Mylyn/FAQ#Why_d ... sk_List.3F
but everything is ok. I'm not using any other filter.
I believe that "Show only my tasks" associates "my" with the user I configure to access mantis.
And then filters the issues to show only the issues with assigned field equal to that user....
Any help?
Regards,
Francisco MourĂ£o
I'm starting to use Mylyn with mantis (Eclipse 4.4.1; Mylyn 3.13.0; Mantis Connector: 3.10.1).
I'm able to load all tasks from a specific project. Some of these tasks are assigned to me.
Although when i click on "Show only my tasks" filter, all tasks are cleared.
I was expecting too see only the tasks "assigned" to me. The term "assigned" as know in mantis.
Right?
I've already checked this link:
http://wiki.eclipse.org/Mylyn/FAQ#Why_d ... sk_List.3F
but everything is ok. I'm not using any other filter.
I believe that "Show only my tasks" associates "my" with the user I configure to access mantis.
And then filters the issues to show only the issues with assigned field equal to that user....
Any help?
Regards,
Francisco MourĂ£o